disadvantages of the grand ethiopian renaissance dam
Second came the 2015 Declaration of Principles (DoP) which concerned the Dam specifically (rather than the Nile more broadly). Although the immediate issue at stakesecuring a technical agreement on the filling of the GERDs reservoiris among Egypt, Ethiopia, and Sudan, the broader and longer-term goal should be for all 11 statesincluding Tanzania, Uganda, the Democratic Republic of Congo, Rwanda, Burundi, Kenya, Eritrea, and South Sudanto agree on a legal regime for the management of this important watercourse. While this means new opportunities to develop extended irrigation-based agriculture for the Sudanese, it represents also a new threat for Egypts current Nile water utilisation (Whittington et al., 2014). Ethiopia rejects Arab League resolution on Renaissance Dam Match. A regional framework for the management of the Nile already existsthe Nile Basin Initiative mentioned abovewhich is a partnership among the Nile riparian states that was launched in 1999. This dam, set to be the largest in Africa in terms of power capacity, continues to cause disagreement between Ethiopia, Sudan and Egypt on filling and operation strategies. The Tripartite National Council (TNC) was then established, consisting of members from each of the three countries with the aim of carrying through the IPoE's recommendations (Attia & Saleh, 2021). Ethiopian opinion is divided over the need for such huge investments in hydroelectric energy when the national network is still very underdeveloped and unable to cope. Addis Ababa launched the construction of the GERD under Zenawi, and work on it has proceeded at full steam ahead ever since. Gebreluel, G. (2014). 74 cubic metres. The principles of cooperation have not been translated into specific technical agreements on dam management (and more), in the context of difficult domestic politics for both sides. Another difficulty for Egypt is that making this argument (i.e. It imports about half its food products and recycles about 25 bcm of water annually. In general, the Ethiopian development philosophy rests on two pillars: mega-dams and mega-agricultural projects. These two factors could become serious problems. In 1964, the US Land Reclamation Bureau conducted a study for the Ethiopian government, identifying 33 hydraulic projects in the Blue Nile Basin. Von Lossow, T. & Roll, S. (2015). A significant segment of local opinion is also aware of the well-known problems that come with mega-dams wherever they are built, among them population displacements and resettlement, reductions in the quality of life, the spread of waterborne diseases, salinisation and the loss of productive and profitable lands, more intense competition over the remaining available land, and losses of cultural and historic heritage. Moreover, with GERD, Ethiopia opts for a hydropower expansion strategy on the Blue Nile, and not an irrigation strategy. In June 2020, tensions escalated when Ethiopia declared its intent to fill the dam in July without an agreement, which again led to Egypt and Sudan requesting UNSC intervention on the matter (Kandeel, 2020). Already, the United States has threatened to withhold development aid to Ethiopia if the conflict is not resolved and an agreement reached. Trilateral talks between Egypt, Ethiopia and Sudan to finalise an agreement on a cooperation framework for the GERD have been mediated by the African Union, World Bank and United States. His successor, Mohamed Morsi, said that Egypt was prepared to defend each drop of Nile water with blood. An armed conflict has not emerged, but there are suggestions that Egyptian intelligence services undermined Ethiopia internally by assisting the Oromo Liberation Front in its campaign of civil unrest in Ethiopia in 2016.
Furnished Apartments For Rent Sydney Cbd,
Victor Valley High School Yearbook,
Who Did Sirius Black Date At Hogwarts,
Articles D